Project information

  • Category: Academia
  • Client: BCA SkyLab
  • Location: 200 Braddell Rd, BCA Braddell Campus, Singapore
  • Area implemented with our solution: Two experimental cells, 132 m2
  • Systems controlled and optimized: Fan Coil Unit (FCU), Active chilled beam, lighting, dynamic façade
  • Performance improvement:
    1. Up to 21.4% reduction of whole-building energy usage
    2. Improved thermal comfort
    3. Improved visual comfort
  • Title: Model predictive control for integrated control of air-conditioning and mechanical ventilation, lighting and shading systems
  • Year: 2021
  • Link: DOI Link
  • Title: Experimental study of a model predictive control system for active chilled beam (ACB) air-conditioning system
  • Year: 2019
  • Link: DOI Link